Government Projects  

 
Working with ROSE Builders, we have completed the upgrading and replacement of Gas Radiant Heating, together with provision of new Heat-Recovery Ventilation Systems on behalf of the MOD at their central Vehicle Repair Workshops. 
 
Installations were carried out with the client in occupation for the majority of the works, which were completed in 2017. 
 
Mechanical value £162K 
 
Working with Hutton Construction Ltd, we have completed the upgrading and replacement Air Conditioning & Ventilation Systems on behalf of Chelmsford City Council at their historic Civic Chambers facility.  
 
Mechanical value £150K 
 
MADSON Air Conditioning were appointed by CADMAN Construction to provide a Design & Build solution for the Mechanical Services associated with the new Surgical Assessment Unit at Colchester hospital. 
 
Our designs comprised of solutions including: 
 
Heat-Recovery Air Conditioning & Ventilation. 
Public Health Services  
 
This project was complete in 2015 with a value of £45K 

Educational Projects 

 
May 2023: 
 
University of Essex ASL Library & Silberrad Projects: 
 
Having provided a Consulting Role to the University of Essex, to establish to services requirements and energy efficient options available, MADSON Air Conditioning have now been appointed to complete the D&B Solution to create two new IT Study Spaces at the Colchester Campus comprising: 
 
Heat-Recovery R2 Air Conditioning Systems 
Heat-Recovery Ventilation Systems 
BMS Interface Works 
 
We will be working in partnership with Hutton Shopfitting to deliver the works over a 10 week period commencing July 2023. 
 
Mechanical value: £346K 
December 2022: 
University of Essex “LAB-7” Facility: 
 
MADSON Air Conditioning have completed the refurbishment and conversion of the LAB-7 teaching space into a new IT Study Facility at the University of Essex, working in partnership with HUTTON Shopfitting
Completed under a Design & Build contract with a fast track fit out program of only 10-weeks we have provided the following. 
 
Heat-Recovery Ventilation Systems 
Heat-Pump Air Conditioning Systems 
BMS Interface
 
Works completed in November 2022 with a contract award of £90Kt to edit it. 
 
 
November 2022 
 
University of Essex: Southend Campus “Nursing Skills & Oral Health” 
 
Provision of the full Mechanical Services refurbishment, to create a Training Facility at The University of Essex, Southend Campus. 
Undertaken on a Design & Build basis, MADSON Air Conditioning have provided the following services: 
Heat-Recovery Ventilation Systems 
Heat-Recovery R2 Air Conditioning Systems 
Compressed Air Services 
Public Health Services 
Building Management System 
 
Works completed in September 2022 with a combined Mechanical value of £550K 
 
"SRES" Facility 
 
Madson Air Conditioning have completed the refurbishment and conversion of the old Sports Hall Squash Sourts & Ancillary Areas into a new Sports Research & Environmental Studies Facility at the University Of Essex. 
 
Completed under a Design & Build Contract with a fast track fit out program of only 10-weeks we have provided. 
 
Heat-Recovery Ventilation 
Heat-Pump Air Conditioning 
Public Health Services 
 
Works Completed In November 2021 With A Contract Award Of £125K 
 
 
"Life Science Laboratories" 
 
Provision of the full Mechanical Services Refurbishment, undertaken over "2 Phases", 
Level 2 "Life Sciences Laboratories" has been given a new lease of life for the new generation of students. 
 
Undertaken on a Design & Build basis, MADSON Air-Conditioning have provided the following services 
 
Heat-Recovery Ventilation System 
Heat-Pump Air-Conditioning System 
Refrigerated Cold Store 
Natural Gas Services 
Compressed Air Services 
Public Health Services 
Oxygen Depletion Control System & Emergency Ventilation 
Building Management System 
MICRO-EDS Waste Disposal System 
Muffle Furnace Extract System 
 
Works Completed In 2022 With A Combined Mechanical Value Of £350K 
 
MADSON Air Conditioning have completed the full Design & Build solution for the Mechanical Services associated with the new build Teaching Block at St. Thomas More School in Southend. Our first project with Davis Construction Ltd. 
 
Our designs comprised of solutions including: 
 
Heat-Recovery Air Conditioning 
Heat-Recovery Ventilation 
IT COMM's Air Conditioning 
Full Public Health Services 
 
This project was complete in 2019 with a value of £260K. 
 
MADSON Air Conditioning were appointed by CADMAN Construction to undertake the installation of new Mechanical Services associated with the refurbishment of the Science Block at Westcliff High School for Boys.  
 
Our installations comprised of: 
 
Classroom Ventilation. 
Heating Upgrade. 
Gas Systems. 
Intelligent Controls. 
Public Health Services. 
 
Complete in 2017 Mechanical value of £168K 
 
MADSON Air Conditioning were appointed by CADMAN Construction to provide a full Design & Build solution for the Mechanical Services associated with the new build Social & Study Space at Colchester 6th Form College. With the emphasis on providing an energy efficient system that would cater for changes in demand, whilst fitting in with Architectural “open plan” services design. 
 
Our designs comprised of solutions including: 
 
Heat-Recovery Ventilation, including DX Heating & Cooling. 
Intelligent Controls. 
Air Conditioning 
 
This project was complete in 2015 with a value of £50K 
 
 
MADSON Air Conditioning were appointed by CADMAN Construction to provide a full Design & Build solution for the Mechanical Services associated with the new build Animal Teaching Facility at Capel Manor College.  
 
Our designs comprised of solutions including: 
 
Heat-Recovery Air Conditioning & Ventilation. 
Close Control Air Conditioning & Ventilation to Small Mammal & Aquatics Areas. 
Underfloor Heating. 
Gas Systems. 
Intelligent Controls. 
Public Health Services including Boosted Services. 
BREEAM “Very Good” rating. 
 
This project was complete in 2015 with a value of £310K 
 
MADSON Air Conditioning were appointed by CADMAN Construction to provide a full Design & Build solution for the Mechanical Services associated with the new build 6th Form Facility on behalf of Havering College.  
 
Our designs comprised of solutions including: 
 
Heat-Recovery Air Conditioning. 
Intelligent Controls. 
Public Health Services  
 
This project was complete in 2015 with a value of £70K 
 
 